澳大利亚于 2025 年 6 月正式实施《2024 年离岸石油与温室气体存储(安全)条例》,取代了过时的 2009 版准则。该条例标志着澳大利亚在离岸 CCS 运营安全领域的重大升级,重点强化了心理健康风险管理 (Psychosocial Risks) 与工人保护。新规强制引入了‘设计通知计划 (Design Notification Scheme)’,要求所有 CCS 注入设施在建设前必须向 NOPSEMA 提交详细的安全案例。此外,条例将事故报告责任从运营商转移到了潜水监管员等一线岗位,确立了全球离岸碳管理领域最严苛的人本安全标准。
National Governance Context
澳大利亚 Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
4
Identified Projects
44
Operational Cap 3.3 Mtpa
Under Construction Cap 0.0 Mtpa
Planned Cap 51.2 Mtpa
Related Policy Network
Directly Linked Assets
Adbri Project
碳捕集 — 0 Mtpa
Cliff Head CCS Project
碳封存 — 1 Mtpa
CTSCo Project
全流程项目 — 0.11 Mtpa
Middle Arm CO2 import terminal (NT)
碳运输 — 0 Mtpa
ZETA
碳利用 — 0.1 Mtpa
NSW CO2 SAP
碳封存 — 0 Mtpa
Otway CCS Hub
碳封存 — 0.2 Mtpa
Cygnus CCS Hub phase 2
碳封存 — 0.5 Mtpa
Cygnus CCS Hub phase 1
碳封存 — 0.5 Mtpa
Incapture G-15-AP
碳封存 — 0 Mtpa
Chevron G-20-AP
碳封存 — 0 Mtpa
Chevron G-18-AP
碳封存 — 0 Mtpa
Worsley Alumina CCS
碳捕集 — 0.7 Mtpa
Ichthys LNG (Darwin)
全流程项目 — 0 Mtpa
5,000 TA CO2 (Australia) phase 1
全流程项目 — 0.005 Mtpa
Arckaringa
碳封存 — 0 Mtpa
Cstore 2
运输与封存 — 7.5 Mtpa
Gorgon CCS
全流程项目 — 1.6 Mtpa
H2Perth Woodside
碳捕集 — 0 Mtpa
Hydrogen Energy Supply Chain (HESC) Project Full scale (CarbonNET)
碳捕集 — 1.8 Mtpa
MEPAU Mid West CCUS hub
碳捕集 — 0 Mtpa
Mid West Clean Energy Project
碳捕集 — 1 Mtpa
Angel CCS
运输与封存 — 5 Mtpa
Moomba Carbon Capture and Storage
全流程项目 — 1.7 Mtpa
South East Australia carbon capture and storage (SEA CCS) hub
运输与封存 — 2 Mtpa
Kwinana Industrial Area CO2 Aggregation Project
碳捕集 — 0 Mtpa
South West Hub Project
碳封存 — 0.8 Mtpa
Wesfarmers Mitsui WA low-carbon ammonia
碳捕集 — 0 Mtpa
Barossa and Darwin liquefied natural gas (DLNG) CCUS
碳捕集 — 2.3 Mtpa
Cstore 1
运输与封存 — 7.5 Mtpa
Reindeer CCS
碳封存 — 5 Mtpa
Santos Bonaparte Basin storage
碳封存 — 0 Mtpa
Bonaparte CCS Block G-7 AP
碳封存 — 10 Mtpa
Berrima cement plant (NSW)
碳利用 — 0.1 Mtpa
Longford gas plant
碳捕集 — 2 Mtpa
Bridgeport Energy Moonie CCUS Project
运输与封存 — 0.12 Mtpa
Woodside Browse CCS Assessment
全流程项目 — 0 Mtpa
Geovault Canning Basin CCS Assessment
碳封存 — 0 Mtpa
J-Power Sumitomo joint feasibility clean hydrogen Latrobe Valley (VI)
碳捕集 — 0 Mtpa
CarbonNet
运输与封存 — 6 Mtpa
HIF Tasmania eFuels Facility (TAS)
碳利用 — 0.3 Mtpa
Yara Pilbara ammonia
碳捕集 — 0 Mtpa
WAH2 Clean Ammonia Project - phase 1
碳捕集 — 0.25 Mtpa
WAH2 Clean Ammonia Project - phase 2
碳捕集 — 0.55 Mtpa