Database / 丹麦 / 2025

2025年丹麦 CCS 补贴计划

经济激励 现行 Verified

2025年,丹麦获得欧盟批准的一项价值 38 亿欧元的 CCS 补贴计划,以支持大规模的捕集与封存。该框架侧重于生物源二氧化碳 (NECCS) 和大规模化石捕集,使丹麦通过 Greensand 等项目成为中欧封存枢纽。

National Governance Context

丹麦 Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

2

Identified Projects

37

Operational Cap 0.0 Mtpa
Under Construction Cap 16.0 Mtpa
Planned Cap 86.8 Mtpa

Related Policy Network

Directly Linked Assets

Thorning storage

碳封存 — 0 Mtpa

Kredsløb Energipark Lisbjerg

碳捕集 — 0.36 Mtpa

HOFOR Amagerværket

碳捕集 — 0.9 Mtpa

BioCirc biogas plant

碳捕集 — 0.131 Mtpa

Sindal Biogas Hjørring Municipality

碳捕集 — 0 Mtpa

Fjernvarme Fyn

碳捕集 — 0.28 Mtpa

Fjord-Projekt CIP (Carbon Captured from Nordværk Incineration Plant)

碳利用 — 0.33 Mtpa

A2X's CCS Esbjerg (Carbon captured from Energnist Incineration Plant in Esbjerg)

全流程项目 — 0.23 Mtpa

European Energy/Brønderslev PtX (Biogas or waste incineration plants in Northern Jutland)

碳利用 — 0.15 Mtpa

CopenCapture (CopenHill Wate to Energy Plant)

全流程项目 — 0.4 Mtpa

Grenaa Port phase 2

碳运输 — 10 Mtpa

Grenaa Port phase 1

碳运输 — 0 Mtpa

CO2 Storage Kalundborg

运输与封存 — 12 Mtpa

Projekt Greenstore

运输与封存 — 0 Mtpa

AffaldPlus Affaldsenergi

碳捕集 — 0.15 Mtpa

Project Bifrost Phase 1

运输与封存 — 3 Mtpa

Greensand Future phase 1

运输与封存 — 0.4 Mtpa

Project Greensand phase 2

运输与封存 — 7.6 Mtpa

Vestforbrænding's Ejby Glostrup incineration plant

碳捕集 — 0.5 Mtpa

Avedøre Power Station CCS

碳捕集 — 0.15 Mtpa

Gassum storage/Fyrkat network (Norne carbon storage hub)

碳封存 — 2.6 Mtpa

Havnso storage/Trelleborg network (Norne carbon storage hub)

碳封存 — 16.4 Mtpa

Port of Aalborg terminal and pipeline to Fyrkat (Norne carbon storage hub)

碳运输 — 15 Mtpa

Port of Kalundborg terminal and pipeline to Trelleborg phase 1 (Norne carbon storage hub)

碳运输 — 4 Mtpa

Port of Kalundborg terminal and pipeline to Trelleborg phase 2 (Norne carbon storage hub)

碳运输 — 8 Mtpa

Project Bifrost Phase 2

运输与封存 — 10 Mtpa

Kalundborg refinery project

碳捕集 — 0 Mtpa

ACCSION Aalborg Portland

碳捕集 — 1.4 Mtpa

ARGO waste-to-energy plant

碳捕集 — 0.35 Mtpa

BIOFOS Carbon Capture Project

碳捕集 — 0 Mtpa

Asnæs Power Station

碳捕集 — 0.28 Mtpa

Avedøre Power Station CCU (Green Fuels for Denmark)

碳利用 — 0 Mtpa

Fortum waste solutions Nyborg

碳捕集 — 0.17 Mtpa

Project Ruby (Rodby) phase 1

碳封存 — 1 Mtpa

Project Ruby (Rodby) phase 2

碳封存 — 6.5 Mtpa

Stenlille project (CO2RYLUS)

碳封存 — 0.5 Mtpa

Amager Bakke/Amager Resource Centre (ARC)

碳捕集 — 0.5 Mtpa