更新后的法律框架为近海封存特许权提供了法律依据,特别支持 Prinos 工业封存枢纽。
National Governance Context
希腊 Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
2
Identified Projects
12
Operational Cap 0.0 Mtpa
Under Construction Cap 1.0 Mtpa
Planned Cap 12.8 Mtpa
Related Policy Network
Peer Frameworks
Directly Linked Assets
Motor Oil Hellas (Iris Project)
碳捕集 — 0.858 Mtpa
IFESTOS Carbon Capture (Kamari plant)
碳捕集 — 1.9 Mtpa
Olea Phase 1
碳捕集 — 0.001 Mtpa
Olea Phase 2
碳捕集 — 0.029 Mtpa
Olea Phase 3
碳捕集 — 0.07 Mtpa
Energean hydrogen plant
碳捕集 — 2.5 Mtpa
APOLLOCO2-LT Revithoussa Island
碳运输 — 3 Mtpa
OLYMPUS Holcim Milaki
碳捕集 — 1 Mtpa
Prinos CCS phase 1
运输与封存 — 1 Mtpa
Prinos CCS phase 2
运输与封存 — 1.8 Mtpa
Prinos sigma plant
碳捕集 — 1 Mtpa
Eleusis oil refinery (Elefsina)
碳捕集 — 0.6 Mtpa