挪威的‘长船’项目将于2025年进入全面运营阶段。监管重点已转向通过与丹麦、荷兰等国签署双边协议(MoUs)来实现二氧化碳的跨国运输和封存,有效落实了伦敦议定书关于 CCS 的修正案。
National Governance Context
挪威 Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
5
Identified Projects
54
Related Policy Network
Directly Linked Assets
CO2 TO METHANOL Finnfjord Ferrosilicon
碳利用 — 0.3 Mtpa
Equinor Mongstad refinery
碳捕集 — 0 Mtpa
Celsio CCS project terminal
碳运输 — 0.4 Mtpa
Eramet Sauda
碳捕集 — 0.26 Mtpa
Stakraft Varme Heimdal (Trondheim)
碳捕集 — 0.22 Mtpa
Returkraft Kristiansand
碳捕集 — 0.13 Mtpa
Climeworks Enova DAC+S plant
碳捕集 — 0 Mtpa
Rana ferrosilicon smelter capture
碳捕集 — 1.5 Mtpa
Rana ferroglobe
碳捕集 — 3.7 Mtpa
Eramet Manganese Porsgrunn phase 2
全流程项目 — 0 Mtpa
Iroko carbon storage
碳封存 — 7.5 Mtpa
Kinno carbon storage (EXL010)
碳封存 — 5 Mtpa
Albondigas carbon storage (EXL008)
碳封存 — 5 Mtpa
Atlas carbon storage
碳封存 — 0 Mtpa
Kaupang carbon storage (EXL012)
碳封存 — 0 Mtpa
Forsete carbon storage (EXL013)
碳封存 — 0 Mtpa
Havstjerne CO2 Storage (FSIU)
运输与封存 — 0 Mtpa
NorDAC Kollsnes (Øygarden)
全流程项目 — 0.5 Mtpa
Norske Skog Skogn (Levanger)
碳利用 — 0.1 Mtpa
Treklyngen Bioforbrenning (Hønefoss)
碳利用 — 0.1 Mtpa
Fritos carbon storage (EXL014)
碳封存 — 0 Mtpa
Project Norway phase 2
碳捕集 — 0.009 Mtpa
Project Norway phase 3
碳捕集 — 0.03 Mtpa
Frevar KF / Kvitebjorn BIO-EL (Borg CO2) (2 facilities)
碳捕集 — 0.12 Mtpa
HeidelbergMaterials Brevik
碳捕集 — 0.4 Mtpa
Kollsnes DAC facility
碳捕集 — 0.5 Mtpa
Lyse Forus Energigjenvinning Stavanger
碳捕集 — 0.1 Mtpa
Altera Stella Maris CCS Project Phase 2
运输与封存 — 3 Mtpa
Norske Skog Saugbrugs (Borg CO2)
碳捕集 — 0.15 Mtpa
Northern Lights Phase 1
运输与封存 — 1.5 Mtpa
Northern Lights Phase 2
运输与封存 — 3.7 Mtpa
Hafslund Oslo Celsio
碳捕集 — 0.35 Mtpa
Polaris offshore storage facility
碳封存 — 8 Mtpa
Sleipner
全流程项目 — 1 Mtpa
Snohvit CO2 capture and storage
全流程项目 — 0.7 Mtpa
Aukra Hydrogen Hub
全流程项目 — 0 Mtpa
Barents Blue ammonia project Train 1
碳捕集 — 2 Mtpa
Barents Blue ammonia project Train 2
碳捕集 — 2 Mtpa
HyDEMO (shelved??)
碳捕集 — 0.15 Mtpa
Barents Blue ammonia project Train 3
碳捕集 — 2 Mtpa
Errai storage project
碳封存 — 8 Mtpa
Luna storage
碳封存 — 5 Mtpa
Borregaard / SAE (Borg CO2) (2 facilities)
碳捕集 — 0.15 Mtpa
BIR Waste-to-Energy Bergen
碳捕集 — 0.1 Mtpa
EU2NSEA PCI Project
碳运输 — 20 Mtpa
Equinor Smeaheia storage phase 2
运输与封存 — 24 Mtpa
Trudvang storage project (EXL007)
碳封存 — 10 Mtpa
STARFISH project (Havstjerne CO2 storage/Altera Stella Maris CCS Project Phase 1)
运输与封存 — 4.275 Mtpa
Poseidon CO2 storage
碳封存 — 5 Mtpa
Equinor Smeaheia storage phase 1 (start up phase)
运输与封存 — 5 Mtpa
Climeworks Norsk e fuel phase 1
碳利用 — 0.039 Mtpa
Gismarvik CO2 hub
碳运输 — 24 Mtpa
Climeworks Norsk e fuel phase 2
碳利用 — 0.035 Mtpa
Climeworks Norsk e fuel phase 3
碳利用 — 0.184 Mtpa