2025 年官方路线图更新,战略重点从技术验证转向大规模商业化应用和基于枢纽的集群化发展。
National Governance Context
中国 Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
14
Identified Projects
49
Related Policy Network
Directly Linked Assets
Baotou Steel (Baogang Group) (Inner Mongolia) phase 1
全流程项目 — 0.5 Mtpa
Baotou Steel (Baogang Group) (Inner Mongolia) phase 2
全流程项目 — 1.5 Mtpa
CRP Haifeng Project (Guangdong)
碳捕集 — 1 Mtpa
Yulin geological storage research facility and CCUS demonstration project (Shaanxi)
碳封存 — 0.1 Mtpa
Carbon Dioxide Full Oxygen Combustion Enrichment and Purification Demonstration Project Qingzhou (Shandong)
碳利用 — 0.2 Mtpa
CNPC 3 million tons Songliao basin demonstration (Heilongjiang)
全流程项目 — 3 Mtpa
Jinjiang Chemical CCUS Project (Xinjiang)
全流程项目 — 0.1 Mtpa
Xinjiang Dunhua Wucaiwan Industrial Park CO2 Capture Project (Xinjiang)
全流程项目 — 0.15 Mtpa
Xinjiang Guoneng Chemical Co CCU Phase 1 (Xinjiang)
全流程项目 — 0.1 Mtpa
Xinjiang Guoneng Chemical Co., Ltd CCU Phase 2 (Xinjiang)
全流程项目 — 0.2 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 1 (Shaanxi)
全流程项目 — 0.4 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 2 (Shaanxi)
全流程项目 — 0.6 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 3 (Shaanxi)
全流程项目 — 3 Mtpa
Yanan Energy Chemical (Shaanxi)
全流程项目 — 0.8 Mtpa
Enping 15-1 offshore CCS (Hong Kong) (well extension)
全流程项目 — 0.1 Mtpa
Xinjiang Jinlong Shenwu Thermal Power Plant (Xinjiang)
碳捕集 — 0.2 Mtpa
CPNC coal power Baijiantan Karamay (Xinjiang) Phase 2
全流程项目 — 1 Mtpa
China Resources Tangshan Caofeidian Power (Hebei)
全流程项目 — 0.15 Mtpa
Huaneng Shanghai Shidongkou Second Power Plant (Shanghai)
全流程项目 — 0.12 Mtpa
GreenGen Huaneng IGCC Project Phase III (Tianjin)
全流程项目 — 2 Mtpa
Sailboat Green Methanol plant Shengong petrochemical (Jiangsu)
碳利用 — 0.16 Mtpa
Karamay Dunhua methanol plant (Xinjiang)
全流程项目 — 0.1 Mtpa
Sinopec Nanjing Chemical Industries CCUS Cooperation Project (Jiangsu)
全流程项目 — 0.2 Mtpa
Sinopec Qilu Petrochemical Shengli (Shandong)
全流程项目 — 1 Mtpa
Sinopec Shengli Power Plant CCS (Shandong)
全流程项目 — 2 Mtpa
Yulin Coal Chemical CCUS (Shaanxi) Phase 1
全流程项目 — 0.3 Mtpa
Daya Bay CCS Hub phase 1 (Guangdong)
运输与封存 — 2 Mtpa
Nanhai petrochemical plant-Capture for Daya bay CCS (Guangdong)
碳捕集 — 0 Mtpa
Daya Bay CCS Hub phase 2 (Guangdong)
运输与封存 — 8 Mtpa
Air Liquide Shanghai Chemical Industry Park (SCIP) decarbonisation (Shanghai)
碳捕集 — 0 Mtpa
Beishui cement CCUS project (Beijing)
碳利用 — 0.1 Mtpa
Jidong cement carbon capture project (Hebei)
碳利用 — 0.1 Mtpa
Huaneng Longdong Energy base/Zhengning coal power plant (Gansu)
碳利用 — 1.5 Mtpa
Guanghui Energy CCUS integration project Phase 1 (Xinjiang)
全流程项目 — 0.1 Mtpa
Jiling Petrochemical CCUS (Nanjing refinery) (Jiangsu) phase 1
全流程项目 — 0.1 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 1
全流程项目 — 0.4 Mtpa
Changling Gas plant /Jilin Oil Field CO2-EOR Full-scale (Jilin)
全流程项目 — 0.6 Mtpa
China Energy Taizhou power (Jiangsu)
全流程项目 — 0.5 Mtpa
China Energy Guohua Jinjie Power (Shaanxi)
全流程项目 — 0.15 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 2
全流程项目 — 0.5 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3
全流程项目 — 1.5 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3 (dedicated storage)
全流程项目 — 0.5 Mtpa
Yulin Coal Chemical CCUS (Shaanxi) Phase 2
全流程项目 — 2.6 Mtpa
CPNC coal power Baijiantan Karamay (Xinjiang) Phase 1
全流程项目 — 1 Mtpa
Yulin Energy Chemical (Shaanxi)
全流程项目 — 1.6 Mtpa
Enping 15-1 offshore CCS (Hong Kong)
全流程项目 — 0.3 Mtpa
Junggar Basin Hub - Northwest phase 1 (Xinjiang)
运输与封存 — 1 Mtpa
Junggar Basin Hub - Northwest phase 2 (Xinjiang)
运输与封存 — 2 Mtpa
Junggar Basin Hub - Refinery Hydrogen (Xinjiang)
碳捕集 — 1 Mtpa