Greece Strategic Framework for CCS Development 2025
Greece moved from framework-setting to operation in fourteen months: Law 5261/2025 (adopted December 12, 2025) is the first comprehensive CCS statute — state-owned storage, exploration licences to five years, plume monitoring with operator liability to strict handover, per-tonne-fee CCS account, carbon-contracts-for-difference route, capture/use/transport licensing, 100 kt threshold, onshore/sub-lake/offshore scope. Licensing sits with HEREMA (competent authority since Law 4920/2022; JMD 48416/2011 transposition; White Paper April 2023). The Prinos CO2 storage permit issued February 26, 2026 to EnEarth Greece (Energean) for 25 years at up to 1 Mt/yr phase one (depleted field plus saline aquifer ~3 km subsea, DG CLIMA opinion, RRF+CEF co-financed), scaling toward 2.8-3 Mt/yr by 2029-2030 inside the France-Italy-Greece Mediterranean plan. The Olympus cement project (Heracles, 0.9 Mt/yr by 2029) and the Apollo midstream project (DESFA pipeline) feed the same store.
National Governance Context
Greece Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
2
Identified Projects
12
Related Policy Network
Peer Frameworks
Directly Linked Assets
Motor Oil Hellas (Iris Project)
Capture — 0.858 Mtpa
IFESTOS Carbon Capture (Kamari plant)
Capture — 1.9 Mtpa
Olea Phase 1
Capture — 0.001 Mtpa
Olea Phase 2
Capture — 0.029 Mtpa
Olea Phase 3
Capture — 0.07 Mtpa
Energean hydrogen plant
Capture — 2.5 Mtpa
APOLLOCO2-LT Revithoussa Island
Transport — 3 Mtpa
OLYMPUS Holcim Milaki
Capture — 1 Mtpa
Prinos CCS phase 1
T&S — 1 Mtpa
Prinos CCS phase 2
T&S — 1.8 Mtpa
Prinos sigma plant
Capture — 1 Mtpa
Eleusis oil refinery (Elefsina)
Capture — 0.6 Mtpa