Circular Carbon Economy (CCE) National Program
Saudi Circular Carbon Economy doctrine (G20-endorsed 2020) runs operationally through Aramco delivery and the 2nd NDC (December 2025): current CCUS capture 1.3 Mt/yr, the Jubail hub (Aramco 60%, Linde/SLB 20/20, shareholders agreement December 2024) capturing 9 Mt/yr by 2028 from three gas plants via pipeline to saline-aquifer storage, Yanbu green-methanol/low-carbon-urea CCU, Hawiyah-Uthmaniyah 800 kt/yr operating EOR, Fertiglobe saline-aquifer pilot with DNV-certified West Aquifer storage, and NEOM hydrogen plus KAPSARC DAC pilots. The programme logic is reduce-reuse-recycle-remove inside oil economics: capture monetised through EOR, blue hydrogen/ammonia exports and (prospectively) GCOM credits, with the Green Financing Framework channeling capital. CCE is less a regulation than an operating system for keeping hydrocarbons investible under a 2060 net-zero pledge.
National Governance Context
Saudi Arabia Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
3
Identified Projects
7
Related Policy Network
Directly Linked Assets
Rumah1 and Rumah 2 plants
Capture — 2.718 Mtpa
Nairyah1 and Nairyah 2 plants
Capture — 2.718 Mtpa
GE Vernova FEED studies
Capture — 0 Mtpa
Aramco gas plants (3 facilities)
Capture — 6 Mtpa
Linde H2 Plant Jubail
Capture — 0 Mtpa
Uthmaniyah CO2-EOR demonstration
Full chain — 0.8 Mtpa
Jubail CCS Hub (*capture sources under evaluation)
T&S — 9 Mtpa