Database / United Kingdom / 2024

UK CO2 T&S Network Code

法律监管 现行 Verified

Established by Ofgem to regulate third-party access to the national carbon backbone, preventing monopolies in the T&S market.

National Governance Context

United Kingdom Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

3

Identified Projects

106

Operational Cap 0.0 Mtpa
Under Construction Cap 12.1 Mtpa
Planned Cap 239.5 Mtpa

Related Policy Network

Directly Linked Assets

Acorn H2

Capture — 0.4 Mtpa

Acorn Isle of Grain to Peterhead shipping

Transport — 2 Mtpa

Fife ethylene plant

Capture — 0 Mtpa

Cauldon cement plant

Capture — 0.54 Mtpa

Veolia EfW to fuels

CCU — 0 Mtpa

CORY EfW plant Belvedere

Full chain — 1.3 Mtpa

Lighthouse Green Fuels

Capture — 0 Mtpa

Emerge CCS

Capture — 0 Mtpa

North Lincolnshire Green Energy Park (NLGEP)

Capture — 0.65 Mtpa

Altalto

Capture — 0 Mtpa

Seal Sands TGEPL

Capture — 0 Mtpa

Saint-Gobain glass

Capture — 0 Mtpa

Connah's Quay Low Carbon Power (CQLCP) Phase 1

Capture — 1.5 Mtpa

Sullom voe terminal and Shetland basin hub (SVT) - Thistle injection phase 1

T&S — 2 Mtpa

Shetland Offshore power generation

Capture — 1 Mtpa

DelpHYnus hydrogen production Theddlethorpe

Capture — 5 Mtpa

Drax BECCS Project (Phase 1)

Capture — 4.3 Mtpa

Drax BECCS Project (Phase 2)

Capture — 3.7 Mtpa

Connah's Quay Low Carbon (CQLCP) Power Phase 2

Capture — 1.2 Mtpa

Killingholme Low Carbon Power project

Full chain — 0 Mtpa

Lynemouth Power Station (BECCS)

Capture — 2.3 Mtpa

RWE CCGT Great Yarmouth (Norfolk)

Capture — 0.6 Mtpa

Sullom voe terminal and Shetland basin hub (SVT) - Magnus phase 2

T&S — 3 Mtpa

Sullom voe terminal and Shetland basin hub (SVT) - Regional Expansion phase 3

T&S — 5 Mtpa

North Tees Hydrogen CO2 capture

Capture — 0.2 Mtpa

Future Biogas plants phase 1

Capture — 0.2 Mtpa

Future Biogas plants phase 2

Capture — 0.345 Mtpa

H21 Leeds City Gate - Teesside hydrogen

Capture — 1.5 Mtpa

H2NorthEast Phase 1

Capture — 0.823 Mtpa

H2NorthEast Phase 2

Capture — 1.495 Mtpa

BP H2Teesside Phase 1

Capture — 1 Mtpa

BP H2Teesside Phase 2

Capture — 1 Mtpa

Hydrogen to Humber (H2H) Saltend phase 1

Capture — 0.89 Mtpa

INEOS Grangemouth refinery and hydrogen production

Capture — 1 Mtpa

Keadby 3 Carbon Capture Power Station

Capture — 1.5 Mtpa

Liverpool Bay CCS project phase 1

T&S — 4.5 Mtpa

Liverpool Bay CCS expansion project (phase 2)

T&S — 5.5 Mtpa

Net Zero Teesside Power

Capture — 2.4 Mtpa

Northern Endurance Partnership phase 1

T&S — 4 Mtpa

Hanson Padeswood Cement Works CCS

Capture — 0.8 Mtpa

Peterhead Carbon Capture Power Station

Capture — 1.5 Mtpa

Peterhead Power Station CCS (2011 version)

Full chain — 1.5 Mtpa

Phillips 66 Humber refinery

Capture — 0.5 Mtpa

Prax Lindsey Oil Refinery Phase 1

Capture — 0.55 Mtpa

Prax Lindsey Oil Refinery Phase 2

Capture — 0.55 Mtpa

Project Cavendish Phase 2

Capture — 1.8 Mtpa

Project Cavendish Phase 1

Capture — 1.2 Mtpa

Redcar Energy Centre EfW

Capture — 0.4 Mtpa

Humber Hub Blue North Killingholme

Capture — 1.6 Mtpa

HyNet Hydrogen Production Project (HPP) Plant 1 (Hynet phase 1)

Capture — 0.65 Mtpa

Suez Tees Valley / Haverton Hill Waste to Energy CCS

Capture — 0.24 Mtpa

Northeast Scotland DAC

Capture — 1 Mtpa

Viridor Runcorn CCS project

Capture — 0.9 Mtpa

Viking CCS Phase 1

T&S — 3.6 Mtpa

Viking CCS Phase 2

T&S — 6.4 Mtpa

VPI Immingham CHP plant CCS

Capture — 3.3 Mtpa

Whitetail Clean Energy

Capture — 0.8 Mtpa

Sizewell C nuclear-powered DAC Full-scale

Capture — 0.05 Mtpa

Hynet Northwest phase 3

Capture — 8.1 Mtpa

Northern Endurance Partnership phase 2

T&S — 4 Mtpa

Northern Endurance Partnership phase 3

T&S — 2 Mtpa

Centrica Equinor hydrogen hub Easington collaboration

Full chain — 0 Mtpa

Milford Haven CO2 Project (Part of Pembroke Net Zero Centre (PNZC))

Full chain — 5 Mtpa

Bacton CCS

T&S — 10 Mtpa

Ince Bioenergy Carbon Capture and Storage (InBECCS) scaleup

Capture — 0.25 Mtpa

Protos CO2 network phase 1

Transport — 0.8 Mtpa

Protos CO2 network phase 2

Transport — 0.4 Mtpa

Medway CCGT power station

Capture — 0 Mtpa

Grain CCGT power station

Capture — 2 Mtpa

Damhead Creek CCGT power station

Capture — 0 Mtpa

Medway Hub CCS

T&S — 6 Mtpa

Energy Recovery Facility Edmonton EcoPark

Capture — 0 Mtpa

Stanlow Oil Refinery

Capture — 0.86 Mtpa

Morecambe Net Zero

Storage — 3 Mtpa

CF Fertilisers Billingham Ammonia CCS

Capture — 0 Mtpa

Rookery South Energy Recovery Facility (ERF)

Capture — 0.38 Mtpa

Buxton Lime Net Zero

Capture — 0 Mtpa

Tees Valley Energy Recovery Facility (TVERF)

Capture — 0 Mtpa

ZerCal250

Capture — 0 Mtpa

Caledonia Clean Energy (previously Captain Clean Energy)

Full chain — 3 Mtpa

Acorn CCS phase 1-Capture at St Fergus

Capture — 0.3 Mtpa

Carbon Capture at Ince Fertiliser Site

Capture — 0.4 Mtpa

Viking CCS Phase 3

T&S — 5 Mtpa

RWE CCGT Staythorpe

Capture — 3.7 Mtpa

e-Alto

CCU — 0 Mtpa

Peak cluster transport

Transport — 3 Mtpa

Ferrybridge EfW

Capture — 1.2 Mtpa

Navigator Terminal train

Transport — 0 Mtpa

Acorn CCS phase 1-T&S

T&S — 0.8 Mtpa

RWE CCGT Stallingborough

Capture — 1.87 Mtpa

Hydrogen to Humber (H2H) Saltend phase 2

Capture — 1 Mtpa

UK Poseidon CCS project phase 1

Storage — 1.5 Mtpa

UK Poseidon CCS project phase 2

Storage — 8.5 Mtpa

UK Poseidon CCS project phase 3

Storage — 30 Mtpa

Enquest CCS Project

Storage — 10 Mtpa

Orion CCS Project Phase 1

Storage — 1 Mtpa

Tellus CCS - CS020 (Area 1)

Storage — 10 Mtpa

Orion CCS Project Phase 2

Storage — 5 Mtpa

Tellus CCS - CS021 (Area 5)

Storage — 6 Mtpa

Tellus CCS - CS022 (Area 7)

Storage — 6 Mtpa

Humberside CCS with Shell and Esso

Storage — 0 Mtpa

Acorn CCS phase 2

T&S — 5 Mtpa

Tranmere and Stanlow Terminal

Transport — 0 Mtpa

Parc Adfer CCS

Capture — 0.235 Mtpa

The Bluestreak CO2 Joint Venture

T&S — 30 Mtpa

HyNet Hydrogen Production Project (HPP) Plant 2 (Hynet phase 2)

Capture — 1.9 Mtpa