Ichthys LNG (Darwin)
Planned Hub: Bonaparte CCS
Consortium Partners: CPC (2.625%) INPEX Ichthys Pty. Ltd. (67.820%) JERA (0.735%) Kansai Electric Power (1.2%) Osaka Gas (1.2%) Toho Gas (0.42%) TotalEnergies (26%
Press Releases & Coverage
1 sourcesExternal reporting and primary sources for this asset, ordered from official announcements to references.
Asset Description
Project Overview
This full chain project is located in Australia (Australia and New Zealand) and is currently Planned. The primary sector classification is Natural gas processing/LNG. The reported fate of captured carbon is Unknown/unspecified. The project is associated with the Bonaparte CCS hub. Announcement year: 2025. Planned or actual operation year: 2030. Reported partners: INPEX Ichthys Pty. Ltd. (67.820%), TotalEnergies (26%, CPC (2.625%), Osaka Gas (1.2%), Kansai Electric Power (1.2%), JERA (0.735%), Toho Gas (0.42%).
Governing Policy Ecosystem
Direct Link Regulatory 2006
Australia Offshore Petroleum and Greenhouse Gas Storage Act 2006
Direct Link Regulatory 2024
Australia Offshore GHG Storage (Safety) Regulations 2024
Direct Link Regulatory 2023
Australia Safeguard Mechanism 2023
Reference Regulatory 2024
Western Australia Petroleum Legislation Amendment Act 2024
Reference Technical Standard 2025