Database / Australia / 2023

Australia Safeguard Mechanism 2023

Regulatory Active Verified

The Safeguard Mechanism caps net emissions of about 208 large industrial facilities (over 100,000 tCO2-e per year across coal, metals, oil and gas, manufacturing and transport) on a trajectory to 43% below 2005 levels by 2030 and net zero by 2050: no more than 100 Mt in 2029-30, zero per year from 2049-50, inside a 1,233 Mt decade budget. Reformed in 2023, production-adjusted baselines decline 4.9% each year to 2030 (then 3.285%), with trade-exposed facilities eligible for discounted decline rates. Facilities beating their baseline earn Safeguard Mechanism Credits (SMCs); those above must surrender ACCUs or SMCs or use flexibility measures (trade-exposed adjustments, multi-year monitoring periods, borrowing). Reported 2024-25 outcomes (Clean Energy Regulator, April 2026): covered emissions 132.7 Mt (down 2.4%), baselines 126.1 Mt (down 7.3%), 13.4 million units surrendered (up 49%), 6.7 million SMCs issued, 205 of 208 facilities compliant. For CCUS the mechanism matters twice: as a demand engine for ACCUs (including CCS methods) and because beating baselines through onsite capture is directly rewarded with SMCs.

National Governance Context

Australia Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

4

Identified Projects

44

Operational Cap 3.3 Mtpa
Under Construction Cap 0.0 Mtpa
Planned Cap 51.2 Mtpa

Related Policy Network

Directly Linked Assets

Adbri Project

Capture — 0 Mtpa

Cliff Head CCS Project

Storage — 1 Mtpa

CTSCo Project

Full chain — 0.11 Mtpa

Middle Arm CO2 import terminal (NT)

Transport — 0 Mtpa

ZETA

CCU — 0.1 Mtpa

NSW CO2 SAP

Storage — 0 Mtpa

Otway CCS Hub

Storage — 0.2 Mtpa

Cygnus CCS Hub phase 1

Storage — 0.5 Mtpa

Incapture G-15-AP

Storage — 0 Mtpa

Chevron G-20-AP

Storage — 0 Mtpa

Cygnus CCS Hub phase 2

Storage — 0.5 Mtpa

Chevron G-18-AP

Storage — 0 Mtpa

Worsley Alumina CCS

Capture — 0.7 Mtpa

Ichthys LNG (Darwin)

Full chain — 0 Mtpa

5,000 TA CO2 (Australia) phase 1

Full chain — 0.005 Mtpa

Arckaringa

Storage — 0 Mtpa

Cstore 2

T&S — 7.5 Mtpa

Gorgon CCS

Full chain — 1.6 Mtpa

H2Perth Woodside

Capture — 0 Mtpa

Hydrogen Energy Supply Chain (HESC) Project Full scale (CarbonNET)

Capture — 1.8 Mtpa

MEPAU Mid West CCUS hub

Capture — 0 Mtpa

Mid West Clean Energy Project

Capture — 1 Mtpa

Angel CCS

T&S — 5 Mtpa

Moomba Carbon Capture and Storage

Full chain — 1.7 Mtpa

South East Australia carbon capture and storage (SEA CCS) hub

T&S — 2 Mtpa

Kwinana Industrial Area CO2 Aggregation Project

Capture — 0 Mtpa

South West Hub Project

Storage — 0.8 Mtpa

Wesfarmers Mitsui WA low-carbon ammonia

Capture — 0 Mtpa

Barossa and Darwin liquefied natural gas (DLNG) CCUS

Capture — 2.3 Mtpa

Cstore 1

T&S — 7.5 Mtpa

Reindeer CCS

Storage — 5 Mtpa

Santos Bonaparte Basin storage

Storage — 0 Mtpa

Bonaparte CCS Block G-7 AP

Storage — 10 Mtpa

Berrima cement plant (NSW)

CCU — 0.1 Mtpa

Longford gas plant

Capture — 2 Mtpa

Bridgeport Energy Moonie CCUS Project

T&S — 0.12 Mtpa

Woodside Browse CCS Assessment

Full chain — 0 Mtpa

Geovault Canning Basin CCS Assessment

Storage — 0 Mtpa

J-Power Sumitomo joint feasibility clean hydrogen Latrobe Valley (VI)

Capture — 0 Mtpa

CarbonNet

T&S — 6 Mtpa

HIF Tasmania eFuels Facility (TAS)

CCU — 0.3 Mtpa

Yara Pilbara ammonia

Capture — 0 Mtpa

WAH2 Clean Ammonia Project - phase 1

Capture — 0.25 Mtpa

WAH2 Clean Ammonia Project - phase 2

Capture — 0.55 Mtpa