FOA 2058: Front-End Engineering Design (FEED) Studies for Carbon Capture Systems on Coal and Natural Gas Power Plants ↗
U.S. Department of Energy · 2019-09-12
-
Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant ↗
U.S. DOE OSTI / NETL · 2022-09-30
-
Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant ↗
National Energy Technology Laboratory (DOE) · 2021-09-30
-
CX-020615: FEED of Linde-BASF Advanced PCC Technology at a Southern Company NG Power Plant ↗
U.S. Department of Energy · 2019-09-20
-
Power Plants ↗
Mississippi Power
Asset Description
Project Overview
This capture project is located in United States (North America) and is currently Planned. The primary sector classification is Power and heat. The reported fate of captured carbon is Dedicated storage. The project is associated with the Project ECO2S: Early CO2 Storage Complex in Kemper County (MS) hub. Announcement year: 2019. Reported partners: Southern Company Services.