Database / China / 2024

Implementation Plan for Green and Low-Carbon Advanced Technology Demonstration Projects

Strategic Active Verified

Policy Core

Issued by NDRC and MEE, this plan selects large-scale CCUS demonstration projects for financial and resource support. Requirements include >500k t/y for petrochemical/oil and >100k t/y for power/steel/cement. First batch (47 projects) released in April 2024, second batch (101 projects) in April 2025.

National Governance Context

China Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

14

Identified Projects

49

Operational Cap 7.0 Mtpa
Under Construction Cap 4.1 Mtpa
Planned Cap 33.5 Mtpa

Related Policy Network

Directly Linked Assets

Baotou Steel (Baogang Group) (Inner Mongolia) phase 1

Full chain — 0.5 Mtpa

Baotou Steel (Baogang Group) (Inner Mongolia) phase 2

Full chain — 1.5 Mtpa

CRP Haifeng Project (Guangdong)

Capture — 1 Mtpa

Yulin geological storage research facility and CCUS demonstration project (Shaanxi)

Storage — 0.1 Mtpa

Carbon Dioxide Full Oxygen Combustion Enrichment and Purification Demonstration Project Qingzhou (Shandong)

CCU — 0.2 Mtpa

CNPC 3 million tons Songliao basin demonstration (Heilongjiang)

Full chain — 3 Mtpa

Jinjiang Chemical CCUS Project (Xinjiang)

Full chain — 0.1 Mtpa

Xinjiang Dunhua Wucaiwan Industrial Park CO2 Capture Project (Xinjiang)

Full chain — 0.15 Mtpa

Xinjiang Guoneng Chemical Co., Ltd CCU Phase 2 (Xinjiang)

Full chain — 0.2 Mtpa

Xinjiang Guoneng Chemical Co CCU Phase 1 (Xinjiang)

Full chain — 0.1 Mtpa

Shaanxi Coal Group Yulin Chemical CCUS Phase 1 (Shaanxi)

Full chain — 0.4 Mtpa

Shaanxi Coal Group Yulin Chemical CCUS Phase 2 (Shaanxi)

Full chain — 0.6 Mtpa

Shaanxi Coal Group Yulin Chemical CCUS Phase 3 (Shaanxi)

Full chain — 3 Mtpa

Yanan Energy Chemical (Shaanxi)

Full chain — 0.8 Mtpa

Enping 15-1 offshore CCS (Hong Kong) (well extension)

Full chain — 0.1 Mtpa

Xinjiang Jinlong Shenwu Thermal Power Plant (Xinjiang)

Capture — 0.2 Mtpa

CPNC coal power Baijiantan Karamay (Xinjiang) Phase 2

Full chain — 1 Mtpa

Huaneng Shanghai Shidongkou Second Power Plant (Shanghai)

Full chain — 0.12 Mtpa

China Resources Tangshan Caofeidian Power (Hebei)

Full chain — 0.15 Mtpa

GreenGen Huaneng IGCC Project Phase III (Tianjin)

Full chain — 2 Mtpa

Sailboat Green Methanol plant Shengong petrochemical (Jiangsu)

CCU — 0.16 Mtpa

Karamay Dunhua methanol plant (Xinjiang)

Full chain — 0.1 Mtpa

Sinopec Nanjing Chemical Industries CCUS Cooperation Project (Jiangsu)

Full chain — 0.2 Mtpa

Sinopec Qilu Petrochemical Shengli (Shandong)

Full chain — 1 Mtpa

Sinopec Shengli Power Plant CCS (Shandong)

Full chain — 2 Mtpa

Yulin Coal Chemical CCUS (Shaanxi) Phase 1

Full chain — 0.3 Mtpa

Daya Bay CCS Hub phase 1 (Guangdong)

T&S — 2 Mtpa

Nanhai petrochemical plant-Capture for Daya bay CCS (Guangdong)

Capture — 0 Mtpa

Daya Bay CCS Hub phase 2 (Guangdong)

T&S — 8 Mtpa

Air Liquide Shanghai Chemical Industry Park (SCIP) decarbonisation (Shanghai)

Capture — 0 Mtpa

Beishui cement CCUS project (Beijing)

CCU — 0.1 Mtpa

Jidong cement carbon capture project (Hebei)

CCU — 0.1 Mtpa

Huaneng Longdong Energy base/Zhengning coal power plant (Gansu)

CCU — 1.5 Mtpa

Guanghui Energy CCUS integration project Phase 1 (Xinjiang)

Full chain — 0.1 Mtpa

Jiling Petrochemical CCUS (Nanjing refinery) (Jiangsu) phase 1

Full chain — 0.1 Mtpa

CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 1

Full chain — 0.4 Mtpa

Changling Gas plant /Jilin Oil Field CO2-EOR Full-scale (Jilin)

Full chain — 0.6 Mtpa

China Energy Taizhou power (Jiangsu)

Full chain — 0.5 Mtpa

China Energy Guohua Jinjie Power (Shaanxi)

Full chain — 0.15 Mtpa

CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 2

Full chain — 0.5 Mtpa

CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3

Full chain — 1.5 Mtpa

CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3 (dedicated storage)

Full chain — 0.5 Mtpa

Yulin Energy Chemical (Shaanxi)

Full chain — 1.6 Mtpa

Yulin Coal Chemical CCUS (Shaanxi) Phase 2

Full chain — 2.6 Mtpa

CPNC coal power Baijiantan Karamay (Xinjiang) Phase 1

Full chain — 1 Mtpa

Enping 15-1 offshore CCS (Hong Kong)

Full chain — 0.3 Mtpa

Junggar Basin Hub - Northwest phase 1 (Xinjiang)

T&S — 1 Mtpa

Junggar Basin Hub - Northwest phase 2 (Xinjiang)

T&S — 2 Mtpa

Junggar Basin Hub - Refinery Hydrogen (Xinjiang)

Capture — 1 Mtpa