Carbon Management Strategy (CMS) & KSpG Amendment
Germany 2024 Carbon Management Strategy key points plus the Carbon Dioxide Storage and Transport Act (KSpTG, in force November 28, 2025; Bundestag November 6, Bundesrat November 21) mark the end of the 2012 de-facto commercial ban: commercial storage is now permitted on the continental shelf and exclusive economic zone with a uniform pipeline-transport regime, onshore storage only via Land opt-in (none exercised yet), and coal-power emissions excluded from networks and stores. The law answers the EU Industrial Carbon Management Strategy and the Net-Zero Industry Act 50 Mt 2030 injection obligation, but legal commentators note the act precedes any robust CMS, funding framework or social settlement: CCS costs of EUR 130-300/t against ~EUR 90 allowances, unconvinced Länder, crowded EEZ planning and the still-pending London Protocol Article 6 ratification (laws of January 29, 2026) make CO2 export to Norway and Denmark the likely near-term use case.
National Governance Context
Germany Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
2
Identified Projects
21
Related Policy Network
Directly Linked Assets
GeZero carbon capture project (Geseke)
Capture — 0.7 Mtpa
Stade facility Green Methanol
CCU — 0.274 Mtpa
Everest
Capture — 1.4 Mtpa
Aker Carbon Capture Biomass CHP (unknown facility)
Capture — 0.25 Mtpa
Capsol feasibility study waste to energy Germany
Capture — 0.18 Mtpa
Capsol feasibility study cement Germany
Capture — 0.4 Mtpa
Waste to hydrogen Boson Energy (BEH2X DE)
Capture — 0 Mtpa
Catch4Climate Mergelstetten
CCU — 0.1 Mtpa
Deuna cement plant (Thuringia)
Capture — 0.62 Mtpa
CarbonBridge
Transport — 0 Mtpa
Heidelberg Materials LEILAC 2
Capture — 0.1 Mtpa
Carbon2Business Laegerdorf
CCU — 1.2 Mtpa
Wilhelmshaven Energy Hub BlueHyNow
Capture — 1.3 Mtpa
H2GE Rostock
Capture — 2 Mtpa
CO2nnectNow HES Wilhelmshaven Tank Terminal phase 1
Transport — 10 Mtpa
Carbon Clean CEMEX Rudersdorf plant phase 1
CCU — 0.11 Mtpa
Cemex Rudersdorf CO2llect
Capture — 1.3 Mtpa
Hover cement works Hannover phase 2
Capture — 0.8 Mtpa
Rohm chemical plant (x2)
CCU — 0.5 Mtpa
German carbon transport grid
Transport — 25.8 Mtpa
Waste to energy CCU to TES Wilhemshaven (unknown facility)
CCU — 0.4 Mtpa