Germany Carbon Management Strategy Key Principles (2024)
The February 2024 Carbon Management Strategy key points (Eckpunkte) with the KSpG amendment draft, adopted by the federal cabinet in May 2024, were Germany first proactive CCUS doctrine: CCS/CCU for hard-to-abate emissions, CO2 transport and offshore storage enablement with marine-protected-area exclusions, and the start of the legislative journey that ended in the November 2025 Carbon Dioxide Storage and Transport Act. The key points already contained the architecture the law later enacted — EEZ/continental-shelf focus, Land opt-in for onshore storage, overriding public interest for permitting, coal-power exclusion — while leaving funding, strategy depth and acceptance to later politics. Read today, the record is the doctrine stage of a two-step sequence (principles 2024, statute 2025), superseded as an action guide by de-carbon-management-strategy-2024 but retained as the decision record of the strategic turn.
National Governance Context
Germany Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
2
Identified Projects
21
Related Policy Network
Peer Frameworks
Directly Linked Assets
GeZero carbon capture project (Geseke)
Capture — 0.7 Mtpa
Stade facility Green Methanol
CCU — 0.274 Mtpa
Everest
Capture — 1.4 Mtpa
Aker Carbon Capture Biomass CHP (unknown facility)
Capture — 0.25 Mtpa
Capsol feasibility study waste to energy Germany
Capture — 0.18 Mtpa
Capsol feasibility study cement Germany
Capture — 0.4 Mtpa
Waste to hydrogen Boson Energy (BEH2X DE)
Capture — 0 Mtpa
Catch4Climate Mergelstetten
CCU — 0.1 Mtpa
Deuna cement plant (Thuringia)
Capture — 0.62 Mtpa
CarbonBridge
Transport — 0 Mtpa
Heidelberg Materials LEILAC 2
Capture — 0.1 Mtpa
Carbon2Business Laegerdorf
CCU — 1.2 Mtpa
Wilhelmshaven Energy Hub BlueHyNow
Capture — 1.3 Mtpa
H2GE Rostock
Capture — 2 Mtpa
CO2nnectNow HES Wilhelmshaven Tank Terminal phase 1
Transport — 10 Mtpa
Carbon Clean CEMEX Rudersdorf plant phase 1
CCU — 0.11 Mtpa
Cemex Rudersdorf CO2llect
Capture — 1.3 Mtpa
Hover cement works Hannover phase 2
Capture — 0.8 Mtpa
Rohm chemical plant (x2)
CCU — 0.5 Mtpa
German carbon transport grid
Transport — 25.8 Mtpa
Waste to energy CCU to TES Wilhemshaven (unknown facility)
CCU — 0.4 Mtpa