France CCUS Deployment Outlook (2024)

Strategic Active Verified

France published its state-of-play and deployment outlook for carbon capture, utilisation and storage on 4 July 2024. It prioritises CCUS for major industrial sites and sectors with limited alternative abatement options, building on the strategic orientations consulted on in 2023.

National Governance Context

France Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

2

Identified Projects

30

Operational Cap 0.0 Mtpa
Under Construction Cap 0.1 Mtpa
Planned Cap 30.7 Mtpa

Related Policy Network

Directly Linked Assets

3D DMX ArcelorMittal and IFPEN Dunkirk (full-scale)

Capture — 0.7 Mtpa

Hynovera

CCU — 0.123 Mtpa

eCapt-Rhone LeTeil

CCU — 0.2 Mtpa

Grand Ouest CO2 (GOCO₂) transport

Transport — 2.6 Mtpa

Neau Lime plant

Capture — 1.6 Mtpa

Saint-Pierre-la-Cour cement plant

Capture — 1 Mtpa

Natran Group CO2 backbone

Transport — 5 Mtpa

Grandpuits DAC hub

Full chain — 0.1 Mtpa

CarboClearTech (Martres-Tolosane cement plant)

Capture — 0.7 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 1

Transport — 1.5 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 2

Transport — 1.4 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 3

Transport — 5.6 Mtpa

BEA Alizay

CCU — 0.35 Mtpa

Papetier Sylvamo Saillat sur Vienne

CCU — 0.6 Mtpa

ReSTart Usine RYAM Tartas

CCU — 0.33 Mtpa

AirvaultGoCO2 cement plant

Capture — 1 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 1

Capture — 0.03 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 2

Capture — 0.07 Mtpa

VAIA project Montalieu-Vercieu site

Full chain — 1.2 Mtpa

K6 Program- Lumbres cement plant

Capture — 0.81 Mtpa

CalCC Lhoist Air Liquide Lime plant Réty

Capture — 0.7 Mtpa

PYCASSO hub phase 1 - eastern and western pipeline

T&S — 1 Mtpa

Gonfreville Raffinerie

Capture — 0.5 Mtpa

VAIA HyNoVi project (Vicat Montalieu plant)

CCU — 0.5 Mtpa

Grandpuits biorefinery

CCU — 0.11 Mtpa

Arcelor Mittal Air Liquide Low-carbon steel

Capture — 1 Mtpa

ECO2Normandy phase 1

Transport — 3 Mtpa

3D DMX ArcelorMittal and IFPEN Dunkirk 'REUZE'

CCU — 0.3 Mtpa

Aluminium Dunkerque feasibility study

Capture — 0.24 Mtpa

Waste-to-energy Aker Carbon Capture (unknown facility)

Capture — 0.2 Mtpa