Strategy for Decarbonising Industry (CCUS Roadmap 2024)
The July 2024 DGEC stocktake operationalises the French CCUS strategy: Phase 1 (2024-2030) builds at least two hubs capturing 4-8 Mt/yr by 2030 (1.5-4 Mt per cluster) across Dunkerque, Fos-sur-Mer, the Rhone axis, Le Havre and Saint-Nazaire, with a first hub possibly functional in 2028 and a deep-decarbonisation support scheme tendered from the June 2024 consultation. Near-term storage is explicitly external: a strategic green-industries partnership with Norway (January 2024, 1.5 Mt/yr via Northern Lights), a Franco-Danish letter of intent plus maritime CO2 export bilateral (March 2024), London Protocol amendment ratification before parliament in 2024 and a full France-Norway CO2 export agreement signed July 2025 (after June 2025 Assembly ratification), alongside the North Sea Basin Task Force and a France-Italy-Greece Mediterranean plan. Sovereign storage follows via BRGM subsurface assessment, an April 2024 call for interest and project funding for exploration. NaTran maps a 16.7 Mt/yr transport corridor; ADEME pricing (EUR 100-150/t against EUR 20-30 cheapest industrial options) frames the cost debate; the EU NZIA 50 Mt 2030 obligation and carbon-market revenues complete the picture.
National Governance Context
France Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
2
Identified Projects
30
Related Policy Network
Peer Frameworks
Directly Linked Assets
3D DMX ArcelorMittal and IFPEN Dunkirk (full-scale)
Capture — 0.7 Mtpa
Hynovera
CCU — 0.123 Mtpa
eCapt-Rhone LeTeil
CCU — 0.2 Mtpa
Grand Ouest CO2 (GOCO₂) transport
Transport — 2.6 Mtpa
Neau Lime plant
Capture — 1.6 Mtpa
Saint-Pierre-la-Cour cement plant
Capture — 1 Mtpa
Natran Group CO2 backbone
Transport — 5 Mtpa
Grandpuits DAC hub
Full chain — 0.1 Mtpa
CarboClearTech (Martres-Tolosane cement plant)
Capture — 0.7 Mtpa
D'Artagnan Dunkirk CO2 Hub Phase 1
Transport — 1.5 Mtpa
D'Artagnan Dunkirk CO2 Hub Phase 2
Transport — 1.4 Mtpa
D'Artagnan Dunkirk CO2 Hub Phase 3
Transport — 5.6 Mtpa
BEA Alizay
CCU — 0.35 Mtpa
Papetier Sylvamo Saillat sur Vienne
CCU — 0.6 Mtpa
ReSTart Usine RYAM Tartas
CCU — 0.33 Mtpa
AirvaultGoCO2 cement plant
Capture — 1 Mtpa
Oak CCS (RepAir Carbon- C-Questra) Phase 1
Capture — 0.03 Mtpa
Oak CCS (RepAir Carbon- C-Questra) Phase 2
Capture — 0.07 Mtpa
VAIA project Montalieu-Vercieu site
Full chain — 1.2 Mtpa
K6 Program- Lumbres cement plant
Capture — 0.81 Mtpa
CalCC Lhoist Air Liquide Lime plant Réty
Capture — 0.7 Mtpa
PYCASSO hub phase 1 - eastern and western pipeline
T&S — 1 Mtpa
Gonfreville Raffinerie
Capture — 0.5 Mtpa
VAIA HyNoVi project (Vicat Montalieu plant)
CCU — 0.5 Mtpa
Arcelor Mittal Air Liquide Low-carbon steel
Capture — 1 Mtpa
Grandpuits biorefinery
CCU — 0.11 Mtpa
ECO2Normandy phase 1
Transport — 3 Mtpa
3D DMX ArcelorMittal and IFPEN Dunkirk 'REUZE'
CCU — 0.3 Mtpa
Aluminium Dunkerque feasibility study
Capture — 0.24 Mtpa
Waste-to-energy Aker Carbon Capture (unknown facility)
Capture — 0.2 Mtpa