Database / France / 2024

Strategy for Decarbonising Industry (CCUS Roadmap 2024)

Strategic Active Verified

The July 2024 DGEC stocktake operationalises the French CCUS strategy: Phase 1 (2024-2030) builds at least two hubs capturing 4-8 Mt/yr by 2030 (1.5-4 Mt per cluster) across Dunkerque, Fos-sur-Mer, the Rhone axis, Le Havre and Saint-Nazaire, with a first hub possibly functional in 2028 and a deep-decarbonisation support scheme tendered from the June 2024 consultation. Near-term storage is explicitly external: a strategic green-industries partnership with Norway (January 2024, 1.5 Mt/yr via Northern Lights), a Franco-Danish letter of intent plus maritime CO2 export bilateral (March 2024), London Protocol amendment ratification before parliament in 2024 and a full France-Norway CO2 export agreement signed July 2025 (after June 2025 Assembly ratification), alongside the North Sea Basin Task Force and a France-Italy-Greece Mediterranean plan. Sovereign storage follows via BRGM subsurface assessment, an April 2024 call for interest and project funding for exploration. NaTran maps a 16.7 Mt/yr transport corridor; ADEME pricing (EUR 100-150/t against EUR 20-30 cheapest industrial options) frames the cost debate; the EU NZIA 50 Mt 2030 obligation and carbon-market revenues complete the picture.

National Governance Context

France Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

2

Identified Projects

30

Operational Cap 0.0 Mtpa
Under Construction Cap 0.1 Mtpa
Planned Cap 30.7 Mtpa

Related Policy Network

Directly Linked Assets

3D DMX ArcelorMittal and IFPEN Dunkirk (full-scale)

Capture — 0.7 Mtpa

Hynovera

CCU — 0.123 Mtpa

eCapt-Rhone LeTeil

CCU — 0.2 Mtpa

Grand Ouest CO2 (GOCO₂) transport

Transport — 2.6 Mtpa

Neau Lime plant

Capture — 1.6 Mtpa

Saint-Pierre-la-Cour cement plant

Capture — 1 Mtpa

Natran Group CO2 backbone

Transport — 5 Mtpa

Grandpuits DAC hub

Full chain — 0.1 Mtpa

CarboClearTech (Martres-Tolosane cement plant)

Capture — 0.7 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 1

Transport — 1.5 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 2

Transport — 1.4 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 3

Transport — 5.6 Mtpa

BEA Alizay

CCU — 0.35 Mtpa

Papetier Sylvamo Saillat sur Vienne

CCU — 0.6 Mtpa

ReSTart Usine RYAM Tartas

CCU — 0.33 Mtpa

AirvaultGoCO2 cement plant

Capture — 1 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 1

Capture — 0.03 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 2

Capture — 0.07 Mtpa

VAIA project Montalieu-Vercieu site

Full chain — 1.2 Mtpa

K6 Program- Lumbres cement plant

Capture — 0.81 Mtpa

CalCC Lhoist Air Liquide Lime plant Réty

Capture — 0.7 Mtpa

PYCASSO hub phase 1 - eastern and western pipeline

T&S — 1 Mtpa

Gonfreville Raffinerie

Capture — 0.5 Mtpa

VAIA HyNoVi project (Vicat Montalieu plant)

CCU — 0.5 Mtpa

Arcelor Mittal Air Liquide Low-carbon steel

Capture — 1 Mtpa

Grandpuits biorefinery

CCU — 0.11 Mtpa

ECO2Normandy phase 1

Transport — 3 Mtpa

3D DMX ArcelorMittal and IFPEN Dunkirk 'REUZE'

CCU — 0.3 Mtpa

Aluminium Dunkerque feasibility study

Capture — 0.24 Mtpa

Waste-to-energy Aker Carbon Capture (unknown facility)

Capture — 0.2 Mtpa