Database / France / 2024

Strategy for Decarbonising Industry (CCUS Roadmap 2024)

Strategic Active Verified

The 2024 French CCUS Strategy establishes a comprehensive roadmap to capture 4-8 Mtpa of CO2 by 2030. It prioritizes hard-to-abate sectors, implements a Carbon Contract for Difference (CCfD) subsidy mechanism, and establishes the legal basis for cross-border CO2 transport through a 2024 bilateral agreement with Norway. It also streamlines subsurface permitting via the Green Industry Act.

National Governance Context

France Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

2

Identified Projects

30

Operational Cap 0.0 Mtpa
Under Construction Cap 0.1 Mtpa
Planned Cap 30.7 Mtpa

Related Policy Network

Directly Linked Assets

3D DMX ArcelorMittal and IFPEN Dunkirk (full-scale)

Capture — 0.7 Mtpa

Hynovera

CCU — 0.123 Mtpa

eCapt-Rhone LeTeil

CCU — 0.2 Mtpa

Grand Ouest CO2 (GOCO₂) transport

Transport — 2.6 Mtpa

Neau Lime plant

Capture — 1.6 Mtpa

Saint-Pierre-la-Cour cement plant

Capture — 1 Mtpa

Natran Group CO2 backbone

Transport — 5 Mtpa

Grandpuits DAC hub

Full chain — 0.1 Mtpa

CarboClearTech (Martres-Tolosane cement plant)

Capture — 0.7 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 1

Transport — 1.5 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 2

Transport — 1.4 Mtpa

D'Artagnan Dunkirk CO2 Hub Phase 3

Transport — 5.6 Mtpa

BEA Alizay

CCU — 0.35 Mtpa

Papetier Sylvamo Saillat sur Vienne

CCU — 0.6 Mtpa

ReSTart Usine RYAM Tartas

CCU — 0.33 Mtpa

AirvaultGoCO2 cement plant

Capture — 1 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 1

Capture — 0.03 Mtpa

Oak CCS (RepAir Carbon- C-Questra) Phase 2

Capture — 0.07 Mtpa

VAIA project Montalieu-Vercieu site

Full chain — 1.2 Mtpa

K6 Program- Lumbres cement plant

Capture — 0.81 Mtpa

CalCC Lhoist Air Liquide Lime plant Réty

Capture — 0.7 Mtpa

PYCASSO hub phase 1 - eastern and western pipeline

T&S — 1 Mtpa

Gonfreville Raffinerie

Capture — 0.5 Mtpa

VAIA HyNoVi project (Vicat Montalieu plant)

CCU — 0.5 Mtpa

Grandpuits biorefinery

CCU — 0.11 Mtpa

Arcelor Mittal Air Liquide Low-carbon steel

Capture — 1 Mtpa

ECO2Normandy phase 1

Transport — 3 Mtpa

3D DMX ArcelorMittal and IFPEN Dunkirk 'REUZE'

CCU — 0.3 Mtpa

Aluminium Dunkerque feasibility study

Capture — 0.24 Mtpa

Waste-to-energy Aker Carbon Capture (unknown facility)

Capture — 0.2 Mtpa