The Netherlands published its CDR Roadmap in 2025, targeting 20-25 Mt of CO2 removals by 2040. The CCUS framework integrates with the Porthos project (operational 2026) and utilizes a CO2 levy for industry, aligned with EU’s industrial carbon management goals.
Netherlands Carbon Dioxide Removal (CDR) Roadmap 2025
Strategic Active
Verified
National Governance Context
Netherlands Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
3
Identified Projects
30
Operational Cap 1.4 Mtpa
Under Construction Cap 15.5 Mtpa
Planned Cap 62.1 Mtpa
Related Policy Network
Directly Linked Assets
OCAP
Transport — 0.5 Mtpa
AEB Amsterdam
Full chain — 0.5 Mtpa
Shell Netherlands Pernis Refineries CCS
Full chain — 0.75 Mtpa
Onyx plant - Port of Rotterdam
Capture — 2.5 Mtpa
H2M Eemshaven
Capture — 1.837 Mtpa
NL CCS Direct Injection Phase 2
T&S — 5 Mtpa
SeaSeaS (Port of Amsterdam)
Transport — 0 Mtpa
Air Products for Exxonmobil Botlek Rotterdam refinery
Capture — 0.958 Mtpa
Air Liquide hydrogen facility Rotterdam (Porthos)
Capture — 0.5 Mtpa
Aramis CCS transport phase 1
Transport — 12.9 Mtpa
H-vision plant 1
Capture — 1.3 Mtpa
H-vision plant 2
Capture — 0 Mtpa
Hydrogen 2 Magnum (H2M)
Capture — 1.3 Mtpa
Porthos onshore transport
Transport — 10 Mtpa
L10 CCS
T&S — 5 Mtpa
L10 CCS phase 2
Storage — 3 Mtpa
Aramis CCS storage phase 1
Storage — 7.5 Mtpa
Porthos offshore transport and storage
T&S — 2.5 Mtpa
Aramis CCS storage phase 2
Storage — 3.1 Mtpa
Shell Netherlands Refineries biodiesel
Capture — 0.38 Mtpa
Shell Netherlands Pernis Refineries CCU
CCU — 0.75 Mtpa
Twence Hengelo facility (Boeldershoek)
CCU — 0.1 Mtpa
Azur Zeeland Refinery
Capture — 0.8 Mtpa
Yara Sluiskil fertiliser
Capture — 0.8 Mtpa
NL CCS Direct Injection Phase 1
T&S — 3 Mtpa
RWE Eemshaven power plant (BECCUS project)
Capture — 8 Mtpa
RWE Amer power plant (BECCUS project)
Capture — 3 Mtpa
H2-gateway
Full chain — 1.8 Mtpa
CO2NEXT terminal phase 1
Transport — 5.4 Mtpa
CO2NEXT terminal phase 2
Transport — 10.3 Mtpa