L10 CCS phase 2
Cancelled Phase: 2 Hub: Aramis/L10 CCS
Consortium Partners: EBN Neptune Energy (Eni) Tenaz Energy Netherlands Offshore XTO Netherlands
Press Releases & Coverage
2 sourcesExternal reporting and primary sources for this asset, ordered from official announcements to references.
References & Portals
Asset Description
Project Overview
This storage project is located in Netherlands (Europe) and is currently Cancelled. The primary sector classification is Storage. The reported fate of captured carbon is Dedicated storage. The project is associated with the Aramis/L10 CCS hub. Announcement year: 2021. Reported partners: Neptune Energy (Eni), EBN, Tenaz Energy Netherlands Offshore, XTO Netherlands.
Governing Policy Ecosystem
Direct Link Regulatory 2024
Netherlands SDE++ Climate Transition Incentive Scheme
Direct Link Strategic 2025
Netherlands Carbon Dioxide Removal (CDR) Roadmap 2025
Direct Link Regulatory 2011
Netherlands Mining Act CO2 Storage Framework (2011)
Direct Link Incentive 2021
Netherlands Porthos SDE++ Operational Subsidy
Reference Technical Standard 2025
Gold Standard Engineered Removals Activity Requirements (2025)
Reference Market 2024