The Dutch SDE++ (Stimulation of Sustainable Energy Production) is the global gold standard for supporting CCUS OPEX. It operates on a ‘Viability Gap Funding’ model, covering the deficit between carbon capture costs and the prevailing market carbon price for 15 years. For the 2024-2025 rounds, the budget was expanded to €8 billion with a subsidy intensity cap of €400 per tonne of CO2. The Porthos project in the Port of Rotterdam is the flagship beneficiary, securing a €2.1 billion grant reservation to enable industrial customers like Air Liquide and Shell to connect to North Sea sinks. This policy provides the multi-decade financial certainty required to position the Netherlands as the primary CO2 logistics hub for Northern Europe.
Netherlands Porthos SDE++ Operational Subsidy
Incentive Active
Verified
National Governance Context
Netherlands Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
3
Identified Projects
30
Operational Cap 1.4 Mtpa
Under Construction Cap 15.5 Mtpa
Planned Cap 62.1 Mtpa
Related Policy Network
Directly Linked Assets
OCAP
Transport — 0.5 Mtpa
AEB Amsterdam
Full chain — 0.5 Mtpa
Shell Netherlands Pernis Refineries CCS
Full chain — 0.75 Mtpa
Onyx plant - Port of Rotterdam
Capture — 2.5 Mtpa
H2M Eemshaven
Capture — 1.837 Mtpa
NL CCS Direct Injection Phase 2
T&S — 5 Mtpa
SeaSeaS (Port of Amsterdam)
Transport — 0 Mtpa
Air Products for Exxonmobil Botlek Rotterdam refinery
Capture — 0.958 Mtpa
Air Liquide hydrogen facility Rotterdam (Porthos)
Capture — 0.5 Mtpa
Aramis CCS transport phase 1
Transport — 12.9 Mtpa
H-vision plant 1
Capture — 1.3 Mtpa
H-vision plant 2
Capture — 0 Mtpa
Hydrogen 2 Magnum (H2M)
Capture — 1.3 Mtpa
Porthos onshore transport
Transport — 10 Mtpa
L10 CCS
T&S — 5 Mtpa
L10 CCS phase 2
Storage — 3 Mtpa
Aramis CCS storage phase 1
Storage — 7.5 Mtpa
Porthos offshore transport and storage
T&S — 2.5 Mtpa
Aramis CCS storage phase 2
Storage — 3.1 Mtpa
Shell Netherlands Refineries biodiesel
Capture — 0.38 Mtpa
Shell Netherlands Pernis Refineries CCU
CCU — 0.75 Mtpa
Twence Hengelo facility (Boeldershoek)
CCU — 0.1 Mtpa
Azur Zeeland Refinery
Capture — 0.8 Mtpa
Yara Sluiskil fertiliser
Capture — 0.8 Mtpa
NL CCS Direct Injection Phase 1
T&S — 3 Mtpa
RWE Eemshaven power plant (BECCUS project)
Capture — 8 Mtpa
RWE Amer power plant (BECCUS project)
Capture — 3 Mtpa
H2-gateway
Full chain — 1.8 Mtpa
CO2NEXT terminal phase 1
Transport — 5.4 Mtpa
CO2NEXT terminal phase 2
Transport — 10.3 Mtpa