Database / Norway / 2025

Norway 2025 CO2 Storage Licensing Round (EXL014)

Regulatory Active Verified

Norway announced one North Sea CO2 storage area on March 5, 2025 under the CO2 Storage Regulations (“Announcement 2025, round 1” — officially the eighth CO2 storage award process, not a fourteenth licensing round; the database ID is kept for compatibility). Following evaluation, Equinor Low Carbon Solutions was offered exploration licence EXL014 effective June 24, 2025. The round continues the Ministry of Energy practice of sequenced storage acreage awards that built the Smeaheia, Luna, Trudvang, Havstjerne and Poseidon pipeline alongside Northern Lights, with French-industry reporting noting several domestic emitters in advanced storage-contract talks. Licensing pairs with the full Norwegian storage regime: NPD resource management, PSA safety oversight, post-closure state stewardship, and London Protocol-compatible export arrangements that let European emitters book Norwegian capacity.

National Governance Context

Norway Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

4

Identified Projects

54

Operational Cap 3.6 Mtpa
Under Construction Cap 4.0 Mtpa
Planned Cap 90.9 Mtpa

Related Policy Network

Directly Linked Assets

CO2 TO METHANOL Finnfjord Ferrosilicon

CCU — 0.3 Mtpa

Equinor Mongstad refinery

Capture — 0 Mtpa

Celsio CCS project terminal

Transport — 0.4 Mtpa

Eramet Sauda

Capture — 0.26 Mtpa

Stakraft Varme Heimdal (Trondheim)

Capture — 0.22 Mtpa

Returkraft Kristiansand

Capture — 0.13 Mtpa

Climeworks Enova DAC+S plant

Capture — 0 Mtpa

Rana ferroglobe

Capture — 3.7 Mtpa

Rana ferrosilicon smelter capture

Capture — 1.5 Mtpa

Eramet Manganese Porsgrunn phase 2

Full chain — 0 Mtpa

Iroko carbon storage

Storage — 7.5 Mtpa

Kinno carbon storage (EXL010)

Storage — 5 Mtpa

Albondigas carbon storage (EXL008)

Storage — 5 Mtpa

Atlas carbon storage

Storage — 0 Mtpa

Kaupang carbon storage (EXL012)

Storage — 0 Mtpa

Forsete carbon storage (EXL013)

Storage — 0 Mtpa

Havstjerne CO2 Storage (FSIU)

T&S — 0 Mtpa

NorDAC Kollsnes (Øygarden)

Full chain — 0.5 Mtpa

Norske Skog Skogn (Levanger)

CCU — 0.1 Mtpa

Treklyngen Bioforbrenning (Hønefoss)

CCU — 0.1 Mtpa

Fritos carbon storage (EXL014)

Storage — 0 Mtpa

Project Norway phase 3

Capture — 0.03 Mtpa

Project Norway phase 2

Capture — 0.009 Mtpa

Frevar KF / Kvitebjorn BIO-EL (Borg CO2) (2 facilities)

Capture — 0.12 Mtpa

HeidelbergMaterials Brevik

Capture — 0.4 Mtpa

Kollsnes DAC facility

Capture — 0.5 Mtpa

Lyse Forus Energigjenvinning Stavanger

Capture — 0.1 Mtpa

Altera Stella Maris CCS Project Phase 2

T&S — 3 Mtpa

Norske Skog Saugbrugs (Borg CO2)

Capture — 0.15 Mtpa

Northern Lights Phase 1

T&S — 1.5 Mtpa

Northern Lights Phase 2

T&S — 3.7 Mtpa

Hafslund Oslo Celsio

Capture — 0.35 Mtpa

Polaris offshore storage facility

Storage — 8 Mtpa

Sleipner

Full chain — 1 Mtpa

Snohvit CO2 capture and storage

Full chain — 0.7 Mtpa

Aukra Hydrogen Hub

Full chain — 0 Mtpa

Barents Blue ammonia project Train 1

Capture — 2 Mtpa

Barents Blue ammonia project Train 2

Capture — 2 Mtpa

HyDEMO (shelved??)

Capture — 0.15 Mtpa

Barents Blue ammonia project Train 3

Capture — 2 Mtpa

Errai storage project

Storage — 8 Mtpa

Luna storage

Storage — 5 Mtpa

Borregaard / SAE (Borg CO2) (2 facilities)

Capture — 0.15 Mtpa

BIR Waste-to-Energy Bergen

Capture — 0.1 Mtpa

EU2NSEA PCI Project

Transport — 20 Mtpa

Equinor Smeaheia storage phase 2

T&S — 24 Mtpa

Trudvang storage project (EXL007)

Storage — 10 Mtpa

STARFISH project (Havstjerne CO2 storage/Altera Stella Maris CCS Project Phase 1)

T&S — 4.275 Mtpa

Poseidon CO2 storage

Storage — 5 Mtpa

Equinor Smeaheia storage phase 1 (start up phase)

T&S — 5 Mtpa

Climeworks Norsk e fuel phase 1

CCU — 0.039 Mtpa

Gismarvik CO2 hub

Transport — 24 Mtpa

Climeworks Norsk e fuel phase 2

CCU — 0.035 Mtpa

Climeworks Norsk e fuel phase 3

CCU — 0.184 Mtpa