Database / Norway / 2024

Norway 'Longship' CCS Project

法律监管 现行 Verified

A full-scale national project connecting industrial capture to the Northern Lights transboundary storage hub.

National Governance Context

Norway Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

5

Identified Projects

54

Operational Cap 3.6 Mtpa
Under Construction Cap 4.0 Mtpa
Planned Cap 90.9 Mtpa

Related Policy Network

Directly Linked Assets

CO2 TO METHANOL Finnfjord Ferrosilicon

CCU — 0.3 Mtpa

Equinor Mongstad refinery

Capture — 0 Mtpa

Celsio CCS project terminal

Transport — 0.4 Mtpa

Eramet Sauda

Capture — 0.26 Mtpa

Returkraft Kristiansand

Capture — 0.13 Mtpa

Stakraft Varme Heimdal (Trondheim)

Capture — 0.22 Mtpa

Climeworks Enova DAC+S plant

Capture — 0 Mtpa

Rana ferroglobe

Capture — 3.7 Mtpa

Rana ferrosilicon smelter capture

Capture — 1.5 Mtpa

Eramet Manganese Porsgrunn phase 2

Full chain — 0 Mtpa

Albondigas carbon storage (EXL008)

Storage — 5 Mtpa

Kinno carbon storage (EXL010)

Storage — 5 Mtpa

Iroko carbon storage

Storage — 7.5 Mtpa

Atlas carbon storage

Storage — 0 Mtpa

Kaupang carbon storage (EXL012)

Storage — 0 Mtpa

Forsete carbon storage (EXL013)

Storage — 0 Mtpa

Havstjerne CO2 Storage (FSIU)

T&S — 0 Mtpa

NorDAC Kollsnes (Øygarden)

Full chain — 0.5 Mtpa

Norske Skog Skogn (Levanger)

CCU — 0.1 Mtpa

Treklyngen Bioforbrenning (Hønefoss)

CCU — 0.1 Mtpa

Fritos carbon storage (EXL014)

Storage — 0 Mtpa

Project Norway phase 2

Capture — 0.009 Mtpa

Project Norway phase 3

Capture — 0.03 Mtpa

Frevar KF / Kvitebjorn BIO-EL (Borg CO2) (2 facilities)

Capture — 0.12 Mtpa

HeidelbergMaterials Brevik

Capture — 0.4 Mtpa

Kollsnes DAC facility

Capture — 0.5 Mtpa

Lyse Forus Energigjenvinning Stavanger

Capture — 0.1 Mtpa

Altera Stella Maris CCS Project Phase 2

T&S — 3 Mtpa

Norske Skog Saugbrugs (Borg CO2)

Capture — 0.15 Mtpa

Northern Lights Phase 1

T&S — 1.5 Mtpa

Northern Lights Phase 2

T&S — 3.7 Mtpa

Hafslund Oslo Celsio

Capture — 0.35 Mtpa

Polaris offshore storage facility

Storage — 8 Mtpa

Sleipner

Full chain — 1 Mtpa

Snohvit CO2 capture and storage

Full chain — 0.7 Mtpa

Aukra Hydrogen Hub

Full chain — 0 Mtpa

Barents Blue ammonia project Train 1

Capture — 2 Mtpa

Barents Blue ammonia project Train 2

Capture — 2 Mtpa

HyDEMO (shelved??)

Capture — 0.15 Mtpa

Barents Blue ammonia project Train 3

Capture — 2 Mtpa

Errai storage project

Storage — 8 Mtpa

Luna storage

Storage — 5 Mtpa

Borregaard / SAE (Borg CO2) (2 facilities)

Capture — 0.15 Mtpa

BIR Waste-to-Energy Bergen

Capture — 0.1 Mtpa

EU2NSEA PCI Project

Transport — 20 Mtpa

Equinor Smeaheia storage phase 2

T&S — 24 Mtpa

Trudvang storage project (EXL007)

Storage — 10 Mtpa

STARFISH project (Havstjerne CO2 storage/Altera Stella Maris CCS Project Phase 1)

T&S — 4.275 Mtpa

Poseidon CO2 storage

Storage — 5 Mtpa

Equinor Smeaheia storage phase 1 (start up phase)

T&S — 5 Mtpa

Climeworks Norsk e fuel phase 1

CCU — 0.039 Mtpa

Gismarvik CO2 hub

Transport — 24 Mtpa

Climeworks Norsk e fuel phase 2

CCU — 0.035 Mtpa

Climeworks Norsk e fuel phase 3

CCU — 0.184 Mtpa