Database / United States / 2021

Texas HB 1284: CCS Jurisdictional Act

Regulatory Active Verified

Texas House Bill 1284 is the definitive legislative pillar establishing state sovereignty over carbon sequestration. Enacted to consolidate oversight of Class VI injection wells under the Railroad Commission of Texas (RRC), the bill was the prerequisite for Texas receiving EPA Primacy in December 2025. By centralizing authority, the law resolves administrative overlaps and accelerates the permitting of over 30 pending multi-billion dollar projects. HB 1284 provides the legal clarity needed for sub-surface pore space ownership and establishes a concession-based framework for large-scale commercial Hubs, turning the Gulf Coast into the global epicenter for CCS deployment.

National Governance Context

United States Overview

Aggregate National Maturity Index (Peak Strength)

Governed Policies

12

Identified Projects

374

Operational Cap 35.3 Mtpa
Under Construction Cap 20.3 Mtpa
Planned Cap 839.4 Mtpa

Related Policy Network

Directly Linked Assets

Cormorant Clean Energy project (TX)

Capture — 1.4 Mtpa

Polk county hub (TX)

Storage — 0 Mtpa

Linde Clear Lake HyCO Plant (TX)

CCU — 0.18 Mtpa

Pineywoods CCS hub (TX)

Storage — 0 Mtpa

West bay storage Galveston (TX)

Storage — 0 Mtpa

Big spring refinery (TX) pilot

Capture — 0.145 Mtpa

Permian Regional Carbon Sequestration Hub (TX)

T&S — 2 Mtpa

Montauk Energy biogas plants (TX)

CCU — 0.14 Mtpa

STRATOS (TX) - phase 1

Full chain — 0.25 Mtpa

STRATOS (TX) - phase 2

Full chain — 0.25 Mtpa

Ammonia Houston Ship Channel (TX)

Capture — 1.6 Mtpa

Whites Bayou (TX)

T&S — 0.5 Mtpa

Port Arthur LNG - Titan Carbon sequestration project (TX)

Full chain — 0 Mtpa

Rose carbon capture and storage (TX)

T&S — 2.2 Mtpa

Beaumont sequestration project (TX)

Storage — 0.25 Mtpa

Texas Gulf Coast CCS Refugio (TX)

Storage — 0 Mtpa

Donaldsville CO2 storage (TX)

T&S — 0 Mtpa

San Patricio-Aransas-Nueces CO2 Infrastructure Project (TX)

Transport — 0 Mtpa

Project Concho (TX) phase 1

Full chain — 0.05 Mtpa

Project Concho (TX) phase 2

Full chain — 0.45 Mtpa

Bayou Bend West onshore (TX)

T&S — 0 Mtpa

Campo Viejo Gas Processing Plant

Full chain — 0.12 Mtpa

New Generation Gas Gathering (NG3)

Capture — 1.2 Mtpa

Enbridge Ingleside Energy Center Low carbon ammonia (TX)

Capture — 1.89 Mtpa

EDF Renewables DAC Park (TX)

Full chain — 0.5 Mtpa

Project Labrador (TX)

Capture — 2.3 Mtpa

Barnett Zero CCS (TX) (Bridgeport plant)

Full chain — 0.183 Mtpa

1PointFive and Entreprise BlueBonnet transport network (TX)

Transport — 0 Mtpa

Kleberg Sequestration Hub (TX)

T&S — 0 Mtpa

Sandpiper Chemical Blue Methanol plant (TX)

Capture — 0 Mtpa

Trinity Campus (TX)

Full chain — 0.09 Mtpa

Trinity Campus (TX)

Full chain — 0.01 Mtpa

ExxonMobil Baytown petrochemical site (TX)

Capture — 7 Mtpa

Freeport LNG CCS (TX)

Full chain — 0.5 Mtpa

HIF USA eFuels Matagorda County (TX)

CCU — 2 Mtpa

Javelina Refinery CCS (TX)

Capture — 0 Mtpa

Svante capture Linde SMR plant (TX)

Capture — 1.435 Mtpa

Lone Star Storage Hub Project (Jasper) (TX)

T&S — 15 Mtpa

Mustang Station Carbon Capture (TX)

Full chain — 1.5 Mtpa

NextDecade Rio Grande LNG (TX)

Capture — 5 Mtpa

Petra Nova Carbon Capture (TX)

Full chain — 1.4 Mtpa

Valero Port Arthur Refinery (TX)

Full chain — 0.9 Mtpa

Hereford Ethanol Plant - Carbon Storage Texas I (TX) (Project Interseqt)

Full chain — 0.35 Mtpa

Project Interseqt - Plainview Ethanol Plant (TX)

Full chain — 0.35 Mtpa

Calpine Deer Park Energy Center (TX)

Capture — 5.6 Mtpa

Terrell Natural Gas Processing Plant (former Val Verde) (TX)

Full chain — 0.5 Mtpa

The ZEROS project Chambers & Liberty County (Jefferson) (TX)

Capture — 1.5 Mtpa

Linde hydrogen plant for Beaumont New Ammonia (TX)

Capture — 2.2 Mtpa

Pecos County Ultra Clean Fuels Refining (TX)

Capture — 0 Mtpa

CF Industries blue ammonia Donaldsonville (LA)

Capture — 2 Mtpa

South Texas DAC Hub (TX)

Full chain — 1 Mtpa

BlueBonnet Sequestration Hub (Chambers, Liberty, and Jefferson County) (TX)

Storage — 8 Mtpa

Bayou Bend East offshore (TX)

T&S — 0 Mtpa

Net Power Odessa gas plant (TX)

Capture — 0 Mtpa

Arcelormittal Hot Briquetted Iron (HBI) plant, Portland (TX)

Capture — 0 Mtpa

CEMEX Balcones Cement plant (TX)

Capture — 0.5 Mtpa

Integratred clean ammonia production, Port of Corpus Christi (TX) phase 2

Capture — 0 Mtpa

Integratred clean ammonia production, Port of Corpus Christi (TX) phase 1

Capture — 0 Mtpa

Carbon Capture Retrofit at Sherman Generating Station (TX)

Capture — 0 Mtpa

Calpine Baytown Energy Center (Baytown decarbonization project) (TX)

Capture — 2 Mtpa

Shell Deer Park Chemical complex (TX)

Capture — 0 Mtpa

Coastal Bend Carbon Management Project (TX)

Storage — 1.5 Mtpa

Coastal Bend Offshore CO2 Storage (TX)

Storage — 0 Mtpa

Carbon Capture on Air Liquide US Gulf Coast Steam Methane Reformer Using the CryocapTM FG Process (TX)

Capture — 0 Mtpa

Combined Carbon Capture Solution on Air Liquide South Texas Steam Methane Reformer (TX)

Capture — 0 Mtpa

Port of Corpus Christi-Mississippi pipeline (TX)

Transport — 250 Mtpa

Century plant (TX)

Full chain — 4.32 Mtpa

Houston-Galveston pipeline (TX)

Transport — 8 Mtpa

Nucor Steel Convent plant (LA)

Capture — 0.8 Mtpa

Midland Basin project: Dusek CCS (TX)

Storage — 0 Mtpa

Corpus Christi carbon storage hub (TX)

T&S — 20 Mtpa

Orchard (TX)

Storage — 1 Mtpa

Dorado (TX)

Storage — 5 Mtpa

Gulf Coast Hydrogen Hub HyVelocity (TX)

Capture — 0 Mtpa

Phoenix project (TX)

Storage — 0 Mtpa

Delaware Basin hub (Loving CCS hub) (TX)

Storage — 2 Mtpa