Boryeong Blue hydrogen
Planned Hub: Bayu-Undan field storage hub
Consortium Partners: Air Liquide Engineering and Construction (H2 production and liquefaction) GE Vernova Korea Midland Power SK E&S Santos etc.
Press Releases & Coverage
5 sourcesExternal reporting and primary sources for this asset, ordered from official announcements to references.
Official & Press Releases
Media Coverage
Asset Description
Project Overview
This capture project is located in South Korea (Other Asia Pacific) and is currently Planned. The primary sector classification is Hydrogen or ammonia. The reported fate of captured carbon is Dedicated storage. The project is associated with the Bayu-Undan field storage hub hub. Announcement year: 2021. Reported partners: SK E&S, Air Liquide Engineering and Construction (H2 production and liquefaction), GE Vernova, Korea Midland Power, Santos, etc..
Governing Policy Ecosystem
Direct Link Regulatory 2025
South Korea CCUS Act Enforcement Decree (2025)
Direct Link Regulatory 2024
South Korea Act on Carbon Dioxide Capture, Transport, Storage and Utilisation
Direct Link Strategic 2025
Korea MOTIE CCUS Strategic Cluster Designation Criteria
Reference Technical Standard 2025
Gold Standard Engineered Removals Activity Requirements (2025)
Reference Market 2024