China 12 National CCUS Standards Package (2026)
On January 8, 2026 the State Administration for Market Regulation (SAMR) via its National Standardization Administration approved 12 national CCUS standards effective July 1, 2026, covering capture, transport, storage, terminology and emission-reduction accounting across the full chain. Storage is governed by GB/T 46878-2025 (geological storage, identical to ISO 27914:2017: site screening and selection, capacity evaluation, injection scheme design, risk management, project management); transport by GB/T 46875-2025 (quality of CO2 entering long-distance pipelines: indicators, sampling, testing, inspection); foundations by GB/T 46872-2025 (vocabulary, identical to ISO 27917:2017, fixing accounting boundaries and procedures) and GB/T 46879-2025 (project-level GHG reduction assessment). The package adds GB/T 46877 (post-combustion systems), 46871 (CO2-EOR storage, identical to ISO 27916:2019), 46870.1/.2 (capture performance evaluation), 46876 (capture facility operation), 46880 (storage test methods) and 46874/46873 (offshore saline-aquifer capacity and site assessment). Five of the twelve are identical adoptions of ISO standards, under SAC/TC207 with drafting by CAS institutes, China Geological Survey units, grid and energy groups. Foreign observers (SESEC) read the release as moving the Chinese CCUS market from rules-pending to rules-transparent.
National Governance Context
China Overview
Aggregate National Maturity Index (Peak Strength)
Governed Policies
18
Identified Projects
49
Related Policy Network
Directly Linked Assets
Baotou Steel (Baogang Group) (Inner Mongolia) phase 1
Full chain — 0.5 Mtpa
Baotou Steel (Baogang Group) (Inner Mongolia) phase 2
Full chain — 1.5 Mtpa
CRP Haifeng Project (Guangdong)
Capture — 1 Mtpa
Yulin geological storage research facility and CCUS demonstration project (Shaanxi)
Storage — 0.1 Mtpa
Carbon Dioxide Full Oxygen Combustion Enrichment and Purification Demonstration Project Qingzhou (Shandong)
CCU — 0.2 Mtpa
CNPC 3 million tons Songliao basin demonstration (Heilongjiang)
Full chain — 3 Mtpa
Xinjiang Dunhua Wucaiwan Industrial Park CO2 Capture Project (Xinjiang)
Full chain — 0.15 Mtpa
Jinjiang Chemical CCUS Project (Xinjiang)
Full chain — 0.1 Mtpa
Xinjiang Guoneng Chemical Co CCU Phase 1 (Xinjiang)
Full chain — 0.1 Mtpa
Xinjiang Guoneng Chemical Co., Ltd CCU Phase 2 (Xinjiang)
Full chain — 0.2 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 1 (Shaanxi)
Full chain — 0.4 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 2 (Shaanxi)
Full chain — 0.6 Mtpa
Shaanxi Coal Group Yulin Chemical CCUS Phase 3 (Shaanxi)
Full chain — 3 Mtpa
Yanan Energy Chemical (Shaanxi)
Full chain — 0.8 Mtpa
Enping 15-1 offshore CCS (Hong Kong) (well extension)
Full chain — 0.1 Mtpa
Xinjiang Jinlong Shenwu Thermal Power Plant (Xinjiang)
Capture — 0.2 Mtpa
CPNC coal power Baijiantan Karamay (Xinjiang) Phase 2
Full chain — 1 Mtpa
Huaneng Shanghai Shidongkou Second Power Plant (Shanghai)
Full chain — 0.12 Mtpa
China Resources Tangshan Caofeidian Power (Hebei)
Full chain — 0.15 Mtpa
GreenGen Huaneng IGCC Project Phase III (Tianjin)
Full chain — 2 Mtpa
Sailboat Green Methanol plant Shengong petrochemical (Jiangsu)
CCU — 0.16 Mtpa
Karamay Dunhua methanol plant (Xinjiang)
Full chain — 0.1 Mtpa
Sinopec Nanjing Chemical Industries CCUS Cooperation Project (Jiangsu)
Full chain — 0.2 Mtpa
Sinopec Qilu Petrochemical Shengli (Shandong)
Full chain — 1 Mtpa
Sinopec Shengli Power Plant CCS (Shandong)
Full chain — 2 Mtpa
Yulin Coal Chemical CCUS (Shaanxi) Phase 1
Full chain — 0.3 Mtpa
Daya Bay CCS Hub phase 1 (Guangdong)
T&S — 2 Mtpa
Nanhai petrochemical plant-Capture for Daya bay CCS (Guangdong)
Capture — 0 Mtpa
Daya Bay CCS Hub phase 2 (Guangdong)
T&S — 8 Mtpa
Air Liquide Shanghai Chemical Industry Park (SCIP) decarbonisation (Shanghai)
Capture — 0 Mtpa
Beishui cement CCUS project (Beijing)
CCU — 0.1 Mtpa
Jidong cement carbon capture project (Hebei)
CCU — 0.1 Mtpa
Huaneng Longdong Energy base/Zhengning coal power plant (Gansu)
CCU — 1.5 Mtpa
Guanghui Energy CCUS integration project Phase 1 (Xinjiang)
Full chain — 0.1 Mtpa
Jiling Petrochemical CCUS (Nanjing refinery) (Jiangsu) phase 1
Full chain — 0.1 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 1
Full chain — 0.4 Mtpa
Changling Gas plant /Jilin Oil Field CO2-EOR Full-scale (Jilin)
Full chain — 0.6 Mtpa
China Energy Taizhou power (Jiangsu)
Full chain — 0.5 Mtpa
China Energy Guohua Jinjie Power (Shaanxi)
Full chain — 0.15 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 2
Full chain — 0.5 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3
Full chain — 1.5 Mtpa
CEIC-CNPC CCUS-EOR demonstration (Ningxia) Phase 3 (dedicated storage)
Full chain — 0.5 Mtpa
Yulin Energy Chemical (Shaanxi)
Full chain — 1.6 Mtpa
Yulin Coal Chemical CCUS (Shaanxi) Phase 2
Full chain — 2.6 Mtpa
CPNC coal power Baijiantan Karamay (Xinjiang) Phase 1
Full chain — 1 Mtpa
Enping 15-1 offshore CCS (Hong Kong)
Full chain — 0.3 Mtpa
Junggar Basin Hub - Northwest phase 1 (Xinjiang)
T&S — 1 Mtpa
Junggar Basin Hub - Northwest phase 2 (Xinjiang)
T&S — 2 Mtpa
Junggar Basin Hub - Refinery Hydrogen (Xinjiang)
Capture — 1 Mtpa