Project Overview
This ccu project is located in United States (North America) and is currently Operational. The primary sector classification is Chemicals. The reported fate of captured carbon is Use. Announcement year: 2022. Planned or actual operation year: 2023. Reported partners: Linde (CO2 capture on CO production site, CCU tech), Celanese (operator of methanol plant), Fairway methanol.